Pinoy Builders Calculator

Send copy via email

  • Concreting
  • Masonry
  • Finishing

Use Pinoy Builders Volume Calculator to compute how much cement you need for your residential project.

Disclaimer: This tool only provides volume estimates and does not guarantee accuracy. For inquiries, contact us here.

Concreting Calculator

Beams, slabs, footing, and more! Find out how much you need for each specific item!

  • Footing
  • Rectangular Columns
  • Floor Slab
  • Beams
  • Circular Columns
  • Stairs

Masonry Calculator

Calculate the amount of cement you need for your masonry job.

  • CHB Wall
  • Wall Footing

Finishing Calculator

Even the perfect finish requires precise calculations!

  • Floor
  • Wall

Concreting > Footing

Input Dimension

Length
* In Meter
Width
* In Meter
Thickness
* In Meter
Number of Footing
* Units
Concrete Mix Design
{{ans2}}

Result

Cement:
{{(((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0)*cf_wall_c | roundup | number : 2 }} BAGS
Sand:
{{(((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0)*0.5 | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0)*1 | number : 2 }} CU.M.
Concrete:
{{((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0 | number : 2 }} CU.M.

Concreting > Rectangular Columns

Input Dimension

Width 1
* In Meter
Width 2
* In Meter
Height
* In Meter
Number of Columns
* Units
Concrete Mix Design
{{ans5}}

Result

Cement bags:
{{(((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0)*crc_wall_c | roundup | number : 2 }} BAGS
Sand:
{{(((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0)*0.5 | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0)*1 | number : 2 }} CU.M.
Concrete:
{{((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0 | number : 2 }} CU.M.

Concreting > Floor Slabs

Input Dimension

Length
* In Meter
Width
* In Meter
Thickness
* In Meter
Number of Slabs
* Units
Concrete Mix Design
{{ans7}}

Result

Cement:
{{(((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0))*cfs_wall_c+0) * cfs_wall_num | roundup | number : 2 }} BAGS
Sand:
{{(((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0))*0.5) * cfs_wall_num | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0))*1) * cfs_wall_num | number : 2 }} CU.M.
Concrete:
{{((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0)) * cfs_wall_num | number : 2 }} CU.M.

Concreting > Beams

Input Dimension

Length
* In Meter
Width
* In Meter
Depth
* In Meter
Number of Beam
* Units
Concrete Mix Design
{{ans11}}

Result

Cement:
{{(((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0))*cb_wall_c) * cb_wall_num | roundup | number : 2 }} BAGS
Sand:
{{((((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0)))*0.5) * cb_wall_num | roundup2 | number : 2 }} CU.M.
Gravel:
{{((((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0)))*1) * cb_wall_num | number : 2 }} CU.M.
Concrete:
{{((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0)) * cb_wall_num | number : 2 }} CU.M.

Concreting > Circular Columns

Input Dimension

Height
* In Meter
Diameter
* In Meter
Number of Columns
* Units
Concrete Mix Design
{{ans14}}

Result

Cement Bags:
{{(((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0)*ccc_wall_c | roundup | number : 2 }} BAGS
Sand:
{{(((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0)*0.5 | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0)*1 | number : 2 }} CU.M.
Concrete:
{{((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0 | number : 2 }} CU.M.

Concreting > Stairs

Input Dimension

Riser Height
* In Meter
Tread Run
* In Meter
Stair Width
* In Meter
Number of Steps
* Units

Result

Cement Bags:
{{(((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w)*9 | roundup | number : 2}} BAGS
Sand:
{{(((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w)*0.5 | roundup2 | number : 2}} CU.M.
Gravel:
{{((((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w)*1 | roundup2 | number : 2 )}} CU.M.
Concrete:
{{((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w | number : 2}} CU.M.

Masonry > CHB Wall

Input Dimension

Length
* In Meter
Width
* In Meter
Side
* In Meter
Number of wall
* Units

Result

Hollow Blocks:
{{(((mcw_wall_w+0) * (mcw_wall_l+0))/0.08)*mcw_wall_num | number : 2 }}
Plastering Bags:
{{(((((mcw_wall_w+0) * (mcw_wall_l+0))/6)*mcw_wall_t)+((((mcw_wall_w+0) * (mcw_wall_l+0))/0.08)/35))*mcw_wall_num | roundup | number : 2 }} BAGS

Masonry > Wall Footing

Input Dimension

Length
* In Meter
Width
* In Meter
Thickness
* In Meter
Number of wall
* Units
Concrete Mix Design
{{ans22}}

Result

Cement:
{{(((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))*mwf_wall_c) * mwf_wall_num | roundup | number : 2 }} BAGS
Sand:
{{(((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))*0.5) * mwf_wall_num | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))*1)* mwf_wall_num | number : 2 }} CU.M.
Concrete:
{{((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))* mwf_wall_num | number : 2 }} CU.M.

Finishing > Floor

Input Dimension

Length
* In Meter
Width
* In Meter
Tile Size
* In Meter

Result

Number of Tile Adhesive Bags:
{{((ff_wall_w+0) * (ff_wall_l+0))/5 | roundup | number : 2 }}

Finishing > Wall

Input Dimension

Length
* In Meter
Width
* In Meter
Finish
* In Meter
Tiles Size
* In Meter
Thickness
* In Meter
Thickness
* In Meter

Result

Number of Skim Coat Bags:
{{((fw_wall_w+0) * (fw_wall_l+0))/12 | roundup | number : 2 }}
Number of Tile Adhesive Bags:
{{((fw_wall_w+0) * (fw_wall_l+0))/5 | roundup | number : 2 }}