Send copy via email

  • Concreting
  • Masonry
  • Finishing

Concreting Calculator

Beams, slabs, footing, and more! Find out how much you need for each specific item!

  • Footing
  • Rectangular Columns
  • Floor Slab
  • Beams
  • Circular Columns
  • Stairs

Masonry Calculator

Calculate the amount of cement you need for your masonry job.

  • CHB Wall
  • Wall Footing

Finishing Calculator

Even the perfect finish requires precise calculations!

  • Floor
  • Wall

Concreting > Footing

Input Dimension

Length
* In Meter
Width
* In Meter
Thickness
* In Meter
Number of Footing
* Units
Concrete Mix Design
{{ans2}}

Result

Cement:
{{(((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0)*cf_wall_c | roundup | number : 2 }} BAGS
Sand:
{{(((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0)*0.5 | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0)*1 | number : 2 }} CU.M.
Concrete:
{{((cf_wall_w+0) * (cf_wall_l+0)* (cf_wall_t+0))*cf_wall_f+0 | number : 2 }} CU.M.

Concreting > Rectangular Columns

Input Dimension

Width 1
* In Meter
Width 2
* In Meter
Height
* In Meter
Number of Columns
* Units
Concrete Mix Design
{{ans5}}

Result

Cement bags:
{{(((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0)*crc_wall_c | roundup | number : 2 }} BAGS
Sand:
{{(((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0)*0.5 | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0)*1 | number : 2 }} CU.M.
Concrete:
{{((crc_wall_w1+0) * (crc_wall_l+0) * (crc_wall_w2+0))*crc_wall_u+0 | number : 2 }} CU.M.

Concreting > Floor Slabs

Input Dimension

Length
* In Meter
Width
* In Meter
Thickness
* In Meter
Number of Slabs
* Units
Concrete Mix Design
{{ans7}}

Result

Cement:
{{(((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0))*cfs_wall_c+0) * cfs_wall_num | roundup | number : 2 }} BAGS
Sand:
{{(((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0))*0.5) * cfs_wall_num | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0))*1) * cfs_wall_num | number : 2 }} CU.M.
Concrete:
{{((cfs_wall_w+0) * (cfs_wall_l+0) * (cfs_wall_t+0)) * cfs_wall_num | number : 2 }} CU.M.

Concreting > Beams

Input Dimension

Length
* In Meter
Width
* In Meter
Depth
* In Meter
Number of Beam
* Units
Concrete Mix Design
{{ans11}}

Result

Cement:
{{(((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0))*cb_wall_c) * cb_wall_num | roundup | number : 2 }} BAGS
Sand:
{{((((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0)))*0.5) * cb_wall_num | roundup2 | number : 2 }} CU.M.
Gravel:
{{((((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0)))*1) * cb_wall_num | number : 2 }} CU.M.
Concrete:
{{((cb_wall_w+0) * (cb_wall_l+0) * (cb_wall_d+0)) * cb_wall_num | number : 2 }} CU.M.

Concreting > Circular Columns

Input Dimension

Height
* In Meter
Diameter
* In Meter
Number of Columns
* Units
Concrete Mix Design
{{ans14}}

Result

Cement Bags:
{{(((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0)*ccc_wall_c | roundup | number : 2 }} BAGS
Sand:
{{(((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0)*0.5 | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0)*1 | number : 2 }} CU.M.
Concrete:
{{((((ccc_wall_d+0) * (ccc_wall_d+0) * 3.1416)/4)*ccc_wall_h+0)*ccc_wall_u+0 | number : 2 }} CU.M.

Concreting > Stairs

Input Dimension

Riser Height
* In Meter
Tread Run
* In Meter
Stair Width
* In Meter
Number of Steps
* Units

Result

Cement Bags:
{{(((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w)*9 | roundup | number : 2}} BAGS
Sand:
{{(((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w)*0.5 | roundup2 | number : 2}} CU.M.
Gravel:
{{((((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w)*1 | roundup2 | number : 2 )}} CU.M.
Concrete:
{{((cs_wall_h*cs_wall_r/2)*cs_wall_w)*cs_wall_s + (((cs_wall_h*cs_wall_s)*(cs_wall_r*cs_wall_s))/2)*cs_wall_w | number : 2}} CU.M.

Masonry > CHB Wall

Input Dimension

Length
* In Meter
Width
* In Meter
Side
* In Meter
Number of wall
* Units

Result

Hollow Blocks:
{{(((mcw_wall_w+0) * (mcw_wall_l+0))/0.08)*mcw_wall_num | number : 2 }}
Plastering Bags:
{{(((((mcw_wall_w+0) * (mcw_wall_l+0))/6)*mcw_wall_t)+((((mcw_wall_w+0) * (mcw_wall_l+0))/0.08)/35))*mcw_wall_num | roundup | number : 2 }} BAGS

Masonry > Wall Footing

Input Dimension

Length
* In Meter
Width
* In Meter
Thickness
* In Meter
Number of wall
* Units
Concrete Mix Design
{{ans22}}

Result

Cement:
{{(((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))*mwf_wall_c) * mwf_wall_num | roundup | number : 2 }} BAGS
Sand:
{{(((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))*0.5) * mwf_wall_num | roundup2 | number : 2 }} CU.M.
Gravel:
{{(((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))*1)* mwf_wall_num | number : 2 }} CU.M.
Concrete:
{{((mwf_wall_w+0) * (mwf_wall_l+0) * (mwf_wall_t+0))* mwf_wall_num | number : 2 }} CU.M.

Finishing > Floor

Input Dimension

Length
* In Meter
Width
* In Meter
Tile Size
* In Meter

Result

Number of Tile Adhesive Bags:
{{((ff_wall_w+0) * (ff_wall_l+0))/5 | roundup | number : 2 }}

Finishing > Wall

Input Dimension

Length
* In Meter
Width
* In Meter
Finish
* In Meter
Tiles Size
* In Meter
Thickness
* In Meter
Thickness
* In Meter

Result

Number of Skim Coat Bags:
{{((fw_wall_w+0) * (fw_wall_l+0))/12 | roundup | number : 2 }}
Number of Tile Adhesive Bags:
{{((fw_wall_w+0) * (fw_wall_l+0))/5 | roundup | number : 2 }}

Disclaimer: This tool only provides volume estimates and does not guarantee accuracy.

For your cement needs or inquiries, contact us here.